How to Find House Construction Cost

How to Find House Construction Cost

How to Find House Construction Cost

Any house construction work started before need some basic detail like before staring work completion. How much cost requirement in house construction.

Here, Before construction, we calculate two types of construction cost

1. Basic / Ruf / Lumsum Calculation

2. Final Calculation

Basic / Ruf / Lumsum Calculation

Basic / Ruf / Lumsum Calculation is before start work calculation. This calculation, we calculate as per our working experience & thumb rule.

So, Here we calculate house construction cost as per our working experience & thumb rule. This house construction cost calculates unit in as per sq ft or sq mt. Mostly person calculates residential construction cost per sq ft.

Also, read: What Is Slab Beam / Hidden Beam / Concealed Beam | Advantage and Disadvantage

In this method, all work calculate in % as per below table

Sr. No. Item of work Percentage of total work
1 All Type Drawing 1%
2 Excavation in ordinary soil and concrete 3%
3 Foundation 5%
4 Construction up to plinth 5%
5 Superstructure in brickwork 25%
6 Roofing including waterproofing 12%
7 Flooring 6%
8 Wood-work, i.e., Joinery, doors, and windows 13%
9 Internal finishes 6%
10 External finishes 5%
11 Water supply 5%
12 Sanitary work 5%
13 Electrification 5%
Total 100%

Above table give me basic detail for Basic / Ruf / Lumsum percentage particular cost. This percentage calculation converts into per sqft how much cost requirement as follow table.

Sr. No. Item of work Percentage of total work Enter Your House Area in Sq ft 
Construction
Rate per Sq ft
700 (as per our area) 1,500 (Working Area)
1 All Type Drawing 1% 10,500
2 Excavation in ordinary soil and concrete 5% 52,500
3 Foundation 6% 63,000
4 Construction upto plinth 6% 63,000
5 Superstructure in brickwork 25% 262,500
6 Roofing including waterproofing 12% 126,000
7 Flooring 6% 63,000
8 Wood work i.e. Joinery, doors and windows 13% 136,500
9 Internal finishes 6% 63,000
10 External finishes 5% 52,500
11 Water supply 5% 52,500
12 Sanitary work 5% 52,500
13 Electrification 5% 52,500
Total 100%  ₹1,050,000 

RufHouse Construction Cost Calculator  Excel Sheet – Download

Video tutorial for better understanding:

 

Also, read: Difference Between CPM and PERT/PERT Vs CPM | What Is CPM & PERT

Final Calculation 

This method used the two main calculations required the first Rate of Items like Footing, RCC and second Quantity in Unite.

Item rate is same of his name rate of the item, ant item rate finalization by rate analysis method

This method requires some drawings like Architecture (Plan, Elevation, Section, Masonry, Detail Drawing), Structure (Footing, Column, Slab, Beam, Etc.), MEP (Mechanical, Electrical, Plumbing) Etc.

In this method as per drawing find Quantity for a different type of work as per below

1. Excavation

2. Footing

3. Backfilling

4. Plinth

5. Anti Termite

6. Plinth Protection

7. Column

8. Slab Casting

9. Brick Masonry

10. In-Side & Out Side Plaster

11. Plumbing

12. Electrical

13. Flooring

14. Door & Window

15. In-Side & Out-Side Paint

16. Cleaning

17. Reinforcement Steel

In this find, quantity required material details, like Footing. One footing How much quantity requirement details like reinforcement, shuttering, cement, aggregate, sand, water, etc.

In this calculation invitational calculation of all item quantity.

Also, read, Rate Analysis of Brick Masonry

How to Find Construction Cost as Below Sheet

Sr.No. Building Construction Unit Rate Qty Amount 
1 Excavation  Cum  151.00  105.96  15,999.96
2 Footing  Cum  4,623.00  1.88  88,946.52
3 Backfilling  Cum  125.00  88.40  11,050.50
4 Plinth beam  Cum  4,819.00  3.89  18,745.91
5 Anti- Termite Treatment  Sqm  69.00  93.16  6,428.04
6 Plinth Protection  Sqm  410.00  24.53  10,057.30
7 Column  Cum  4,944.00  0.76  3,757.44
8 Slab  Cum  5,106.00  9.89  50,498.34
9 Brick Masonry  Sqm  1,150.00  13.06  15,019.00
10.1 External Plaster  Sqm  395.00  310.08  122,481.60
10.2 Internal Smooth Cement Plaster  Sqm  230.00  68.04  15,649.20
11 Plumbing Rmt  200.00  465.80  93,160.00
12 Electrical Rmt  210.00  465.80  97,818.00
13 Flooring  Sqm  1,413.00  56.96  80,484.48
14.1 Door  Sqm  5,990.00  12.10  72,493.38
14.2 Window Sqm  590.00  61.60  36,344.00
15.1 Plastic Emulsion Paint Sqm  214.00  174.03  37,242.42
15.2 Apex paint Sqm  128.00  451.19  57,751.68
16 Cleaning Sqm  100.00  93.16  9,316.00
17 Reinforcement Steel  M.T.  56,753.00  4.85  274,968.29
Total Amount  1,118,212.05 

Final Construction Cost Excel Sheet – Download

 

Like this post? Share it with your friends!

Suggested Read –

What is BoQ | BoQ Meaning | Advantages of BoQ | What is BoM

What Is Rate Analysis | Rate Analysis of Earth Work, Brick, Concrete and Plaster

What Is Construction Contract | Types of Engineering Contracts | Percentage-Rate Contract

Estimation for Building Works | Centre Line Method | Long and Short Wall or Out and in to in a method